List of Document required for construction of house in goa

 Documents-for-House-Construction-goa

Document required for construction of house in goa

  • 1) Orignal copy of the latest survey plan of the plot where house construction is to be done.
  • 2) Orignal copy of Form I & XIV. (Mutation)
  • 3) Attested copy of Ownership document from Notary.
  • 4) Original copy of SANAD of the plot. - It's the Construction Approval Process. Its takes around  90 days plus to get the SANAD generally.

Once the Land Owner in Goa gets the  SANAD /Construction Approval, He or She must make an Affidavit to give permission for the engineer/Architect.

Read also:

See the Sample Affidavit to Give Permission by land Owner in Goa to Architect & Engineer below. You can also Download this by Clicking here. 
 Affidevit sample to Give Permission by land Owner in Goa to Architect & Engineer


Popular posts from this blog

Construction Price of Bungalow in Goa India(FAQ) (2023)

Civil Contractor Building Construction Rates Details Goa 2023

Construction Civil Work Labour Rate Quotation Format Goa - 2023